Temporary Supply

temporary-supply

Planning an event or to build? Special events or activities at a construction site sometimes result in the need for temporary electricity supply. Whenever this occurs there are certain guidelines that we require all our customers to follow.

  1. Have the property is checked by a Certified Electrician to ensure that breakers, grounding wires and other electrical connections are ready to receive electricity.
  2. Have a Government Electrical Inspector (GEI)  check the installation and issue a certificate, if approved.
  3. Make an application to JPS at least five days before the electricity is needed. Provide JPS with details of the load requirements, for example, the types of equipment that will be used at the location. Make a deposit, based on the required load, sign a contract before the service is provided.